|
I would like to commend Lee for an outstanding remodeling job that was done on my
Bathroom. His task included: tearing out the entire bathroom and starting from scratch.
He reconstructed, rebuilt, and insulated the walls, ceiling and floors; he removed a cupboard
to enlarge the working place. He added a ceiling light/fan for ventilation due to having to seal
the bathroom window. At my request, Lee repositioned the bathtub and toilet bowl to another area
in the room which required him to gain assistance from a plumber to re-pipe the bathroom.
He installed a new bathtub/shower kit with an easy access panel for maintenance if needed,
a new toilet bowl, and a new sink. He rewired the electrical elements for the medicine cabinet
and light fixtures. Lee did extensive work in refinishing the walls and rebuilding the floor
which was uneven. His finishing touches included painting the walls white down to the baseboards.
The added touches were the installment of the wooden accessories i.e. sink cabinet, medicine cabinet,
towel racks, soap dish, and toothbrush holders.
The restoration process took about three and one half (3 1/2) to four (4) weeks. His punctual
and efficient work habits made it easy for me to recommend him to others for remodeling work.
In fact he will be back to do more work.
Sincerely yours,
Stephanie Anderson
|